Case Studies in Access Roads
See how GroundGuards Global mats support projects in real ground conditions.
These case study articles show how teams protect the ground, control access and keep work moving on live sites.
Case Studies
MaxiTrack Access for AC Installation
Narrow access and hard surfaces were no match for MaxiTrack, which enabled safe, stable access for new air conditioning units on a tight site.
Read moreProMat Access Road Across Soft Ground
Discover how ProMat created a safe, quick-install access road across soft ground for a project in North Yorkshire.
Read moreGround Protection for Housing Site
Discover how XtremeMat provided stable access for early ground investigation works on a new housing development site.
Read moreFastCover at Bradford City of Culture
See how FastCover mats created access routes, staging, and walkways for a major Bradford City of Culture event, protecting Bowling Park’s green space.
Read moreAccess Over Floodplain in Bognor Regis
Discover how XtremeMat helped navigate low clearance and floodplain challenges on a cable project near Bognor Regis.
Read moreMaxiTrack Put to the Test by Army
The British Army’s Royal Engineers tested GroundGuards’ MaxiTrack for use in military logistics and access routes. See how the mats performed under pressure.
Read moreMaxiTrack Road for Terex Dump Trucks
Find out how MaxiTrack proved its strength under pressure, supporting 100-tonne Terex dumper trucks on rough terrain without damage.
Read moreMaxiTrack Access for Network Rail RRAP
Discover how MaxiTrack provided a cost-effective, damage-free RRAP solution for Network Rail’s electrification works at Newport station.
Read moreMaxiTrack Protects Tonbridge School Roads
Discover how GroundGuards’ MaxiTrack system protected tarmac roads from damage during heavy construction works at Tonbridge School.
Read moreMaxiTrack Housing Site Access
See how MaxiTrack trackway enabled safe, stable access on soft and damaged ground across two Barratt Homes sites in Harrogate and Northampton.
Read moreMaxiTrack Farmyard Haul Road, Wealden
See how GroundGuards’ MaxiTrack created a rapid, damage-free haul road across a working farmyard for a new crematorium project in East Sussex.
Read moreMaxiTrack Parkland Diversion Road
See how MaxiTrack enabled a 150m temporary road across soft parkland, diverting traffic safely during a construction project on the south coast.
Read more