All Case Studies
See how GroundGuards Global mats support projects in real ground conditions.
These case study articles show how teams protect the ground, control access and keep work moving on live sites.
Case Studies
Access Over Floodplain in Bognor Regis
Discover how XtremeMat helped navigate low clearance and floodplain challenges on a cable project near Bognor Regis.
Read moreUltraTrack Pro Temporary Car Park
A North Wales energy plant needed extra parking fast. GroundGuards delivered with UltraTrack Pro, creating a solid car park over grass with zero ground damage.
Read moreFastCover Wheelchair Walkway in Reading
FastCover created a safe, temporary wheelchair-accessible walkway around a muddy housebuilding site in Reading, ensuring public access throughout winter.
Read moreMaxiTrack Put to the Test by Army
The British Army’s Royal Engineers tested GroundGuards’ MaxiTrack for use in military logistics and access routes. See how the mats performed under pressure.
Read moreMaxiTrack Forest Road at Kielder
Discover how MaxiTrack mats provided safe HGV access through Kielder Forest, enabling hillside lodge construction without ground disruption.
Read moreMaxiTrack Pad for Hilltop Access
See how MaxiTrack created a stable vehicle pad for transmission line maintenance on a remote hilltop near Halifax, enabling safe site access.
Read moreMaxiTrack Road for Terex Dump Trucks
Find out how MaxiTrack proved its strength under pressure, supporting 100-tonne Terex dumper trucks on rough terrain without damage.
Read moreMaxiTrack Access for Network Rail RRAP
Discover how MaxiTrack provided a cost-effective, damage-free RRAP solution for Network Rail’s electrification works at Newport station.
Read moreMaxiTrack Protects Tonbridge School Roads
Discover how GroundGuards’ MaxiTrack system protected tarmac roads from damage during heavy construction works at Tonbridge School.
Read moreFastCover Footpath for School Access
Discover how FastCover created a safe, trip-free temporary walkway for pupils at St. Peter’s School in York during a 40-week construction project.
Read moreMaxiTrack Saves Plantworx from the Mud
Discover how GroundGuards’ MaxiTrack mats created safe walkways at a rain-soaked Plantworx event, helping exhibitors and visitors stay on track.
Read moreWoodland Access at Whyteleafe Station
Discover how GroundGuards’ MaxiTrack created a safe woodland haul road for crane and vehicle access at Whyteleafe Railway Station in Croydon.
Read more